Welcome to the official website of Jiangsu Xinda high altitude Engineering Co., Ltd! The company specializes in basement plugging, pool plugging, pipeline plugging, sewage pool plugging, elevator shaft plugging, expansion joint plugging, coal Gallery plugging and other projects. Service hotline: 15951480278.

contact us Add to collection

 Jiangsu Xinda high altitude Engineering Co., Ltd

National Service Hotline 139-1462-1718

Industry trends

Manpower allocation plan and material equipment and material allocation plan for water pool plugging

Hits: 605 19:51:39, June 3, 2019 source: Jiangsu Xinda high altitude Engineering Co., Ltd

News Abstract: in the whole leakage stoppage work of the whole pool, four persons are guaranteed to carry out the preliminary plugging work and on-site duty, and the on-site problems are reported to the relevant departments every day. If more leakage is found, more personnel and main materials will be appropriately assigned.

1、 Labor allocation plan
During the whole leakage stoppage work of the pool, 4 persons are always guaranteed to carry out the preliminary plugging work and on-site duty, and the on-site problems are reported to the relevant departments every day. If more leakage is found, appropriate additional personnel and main materials will be sent.
II. Material equipment and material allocation plan
Table 1
Serial number product name quantity unit remarks
One sl-500 glue injection machine
1 imported electric hand hammer
One 3-50 drilling rig for emergency use
4. 20 bags of sulphoaluminate cement
20 bags of 5-32.5 cement should be used urgently
6-sl-669 single liquid polyurethane 4 barrels
Note: the above plan will be adjusted according to the project situation.
All the details are in place to stop the leakage in the pool
Only when the design, materials, construction, treatment and maintenance of the water tank are completed, can the service life of the plugging be guaranteed and extended. At the same time, in the new specification, the acceptance scale and maintenance method of plugging quality are defined to control the construction quality. It should be based on materials, design as conditions, construction as the hub, strengthen treatment and maintenance, and carry out comprehensive management of waterproof and plugging. And exaggerate that in the construction of waterproof and plugging, the maintenance should be carried out according to the construction process and level, and the next process and level of work can be carried out after passing the inspection.
All the above work has been done. The quality of the project I want to do will certainly meet the strict requirements.

Next: What are the common problems and solutions when plugging the sewage pool

Last article: Grouting technology for water tank leakage stoppage